How to Select LT Control Cables: Conductor, Insulation, Screening and Armouring
Picking a control cable from a catalogue looks easy. Choose the core count, choose the size, place the order. The trouble starts when the cable gets to site and turns out to be wrong for the route: too stiff to pull, too thin for the distance, or exposed to noise it was never built to handle. A few decisions made early prevent most of that.
This guide walks through the choices in the order we would make them if we were specifying the cable ourselves.
Step 1: Count your circuits, then add spares
List every circuit the cable has to serve: start, stop, trip, feedback, indication, interlocks. That gives you the live cores. Then add spare cores. Adding about 10 to 20 percent is a common practice, because adding a circuit later is far cheaper than pulling a new cable. If you need 10 live cores, order a 12-core cable.
Step 2: Size the conductor for distance, not just current
Control currents are small, so people tend to default to 1.5 sq mm everywhere. That works for short runs. Over longer distances, the voltage drop in the cable can reduce the voltage available at the coil of a contactor or relay, and the device may fail to pick up reliably. For long runs, move up to 2.5 sq mm or more. Mechanical strength also matters: very thin conductors can be damaged while pulling through long conduits.
For most normal conditions, PVC is enough. In plants where cable trays run near hot equipment, XLPE gives you more margin.
Step 4: Decide whether you need screening
Control cables for simple on/off signals in a clean environment usually do not need screening. But if the cable runs next to variable frequency drives, large motor feeders or welding equipment, electrical noise can induce false signals. In such cases, a copper tape or braided screen, earthed properly at one end, protects the signal. Where you are carrying delicate analogue signals, you are in instrumentation territory and a different cable, such as those from instrumentation cables manufacturers in India, may be more suitable.
Step 5: Armouring and protection
Installation condition
Suggested construction
Inside a building, in trays, no mechanical risk
Unarmoured, PVC or FRLS sheath
Direct burial or ducts with mechanical risk
Armoured with galvanised steel wire or strip
Crowded plant floor, risk of impact
Armoured
Enclosed spaces, tunnels, public buildings
FRLS outer sheath
Areas with rodents or termites
Armoured, with a suitable sheath compound
Armour also helps carry fault current to earth, but only if it is terminated properly using the right glands. Armour that is cut and left floating does nothing useful.
Step 6: Think about the sheath
In outdoor trays, the sheath sees sunlight, heat and rain. Ask the manufacturer whether the compound is formulated for UV resistance. In indoor areas with many people or limited escape routes, a flame retardant low smoke (FRLS) sheath reduces the hazard in a fire.
Step 7: Check the identification and drum length
For cables with many cores, numbered cores are easier to work with than colours alone, because there are only so many colours. Ask how the numbers are printed and whether they stay legible after handling. Then check drum lengths. Cutting a drum to suit the route wastes cable, so plan route lengths and ask the manufacturer about standard drum sizes.
Step 8: Write the specification clearly
A good order line looks something like this: 1.1 kV, 12 core, 2.5 sq mm, stranded copper, PVC insulated, armoured, FRLS outer sheath, to IS 1554 (Part 1), numbered cores. Every item removes a chance of a misunderstanding.
What to ask the supplier
Which standard does the cable conform to?
Is the conductor annealed copper, and can you share the resistance test result?
Are routine test certificates provided with every lot?
What are the available drum lengths and the delivery time?
BotsonCab provides technical data sheets for its cable categories, which can be a helpful reference when you are writing a specification or checking dimensions and construction